Page 32 - qp_12
P. 32

Score
              % Score


          4   POST - ANALYTICAL : RECORD AND REPORT OF TEST RESULT
         4.1 LIS system and excel format                                 O
         4.2 Result format                                               O
         4.3 Reporting                                                   O
         4.4 Turn around time                                            I
         4.5 Retention time for record and report                        I
         4.6 Outsourcing specimen to referral lab
                - Referral lab                                           O
                - Triple layer packaging                                 O
         4.7 Despatch of laboratory results                              O
              Score
              % Score



          5   HANDLING AND MAINTENANCE OF LAB EQUIPMENT
         5.1 Handling of :
                -  Centrifuge                                          EPW
                -  Biosafety Cabinet                                   EPW
                 - VITEK 2                                             EPW
                 - Autoclave                                           EPW
                 - Microscope                                          EPW


         5.2 Daily/ weekly/ monthly maintenance                        EPW
         5.3 Equipment Verification
               -    Pipette                                            EPW
               -    Balance                                            EPW
               -    Timer                                              EPW
               -    Freezer/ Fridge                                    EPW
               -    Incubator                                          EPW
               -    Waterbath                                          EPW
               -    pH meter                                           EPW
         5.4 Generate report, if applicable                              O
         5.5 Plan Preventive Maintenance/ Servicing                      O
         5.6 Procedure for faulty equipment/ breakdown                   I
         5.7 Receiving & Commissioning new equipment                   EPW

              Score
              % Score




          6   SAFETY
              Universal Precaution-Personal protective
         6.1 equipments (PPE), i.e. N95 mask, glove, coat,               I
              goggle
   27   28   29   30   31   32   33   34   35   36   37