Page 9 - qp_19
P. 9

MAKMAL KESIHATAN AWAM KOTA BHARU

                                                              Document Number          : MKAKB/BP/QP-19
                           QUALITY PROCEDURE
                                                              Issue Number             : 01
                      MANAGEMENT OF LABORATORY                Issue Date               : 03.04.2016
                           INFORMATION SYSTEM                 Page Number              : 4 of 6

                     NO                            PROCEDURE                              RESPONSIBILITY

                    6.7.0   CONTINGENCY PLAN
                    6.7.1   Inform  L D/ CM / HOS/ HOU/ SO  if  there  are  events  of  OIC/SO/ MLT/ ASO
                            failure  in  LIS  that  affect  the  laboratory’s  ability to provide
                            the service.

                    6.7.2   Inform  and  confirm  the  event  with  IT  personnel  or  officer   HOS/ HOU/ SO/
                            incharge.  Fill out  the  Corrective Action  Request Form.           AITO
                            (Appendix 1)

                    6.7.3   Investigate  the  cause  of  the  event  and  define  the  category
                            of  crisis:

                            a. Website failure (Internet connection problem)                AITO/ IT MKAK
                            b. Portal failure (Server problem/Local Area Network
                              Problem) for SIMKA
                            c. Others (to be specified)

                    6.7.4   Contingency plan:

                            a)   Identify the cause and take appropriate action according   HOS/ HOU/ SO
                                to respective SOP.
                            b)   Inform client regarding the situation.
                            c)   Release result manually.

                    6.7.5   Notify clients once the LIS has been recovered.                HOS/ HOU/ AITO

                            Transcribe the result once system recovered.                  CM/SO/ MLT/ ASO

                    6.8.0   BACK UP FOR DATA AND INFORMATION
                    6.8.1   For SIMKA                                                        Administrator
                            Backup SIMKA daily by administrator (MKAK IT officer) in the        SIMKA
                            designated computer at MKAK Sg Buloh.

                            Backup server every 3 to 7 days

                    6.8.2   For iLAB                                                             OIC
                            iLAB  will  automatically  perform  backup  daily  at  scheduled
                            time. Copy back up data file from iLAB to external hard disk
                            once a week.

                    6.8.3   For DMS                                                          OIC/SO/MLT
                            Perform  copy  back  up  data  file  from  DMS  to external  hard
                            disk weekly. DMS will manually perform backup monthly by
                            assigned vendor.





                  Disease Sector                                                           Quality Procedure
                                                CONTROLLED DOCUMENT
   4   5   6   7   8   9   10   11   12   13   14